A seven-story senior housing complex has been slated for development at Rockridge Geotechnical’s 1335-1385 Galindo Street site in Concord. The facility will contain 150 units for seniors, with 117 of those units being assisted living units and 33 being memory care units. Seniors within the facility will have access to around-the-clock care and other services, as well as amenities like on-site parking.
A review will be taking place today discussing the six-story residential development at Rockridge Geotechnical’s site at 2127 Dwight Way in Berkeley. The T-shaped complex will conform around buildings already existing on-site, and it will contain 66 units ranging from one-bedrooms to six-bedrooms. The development will also include abundant landscaped open space, complete with turf grass, a dining table, and seating.
From SFYIMBY: https://sfyimby.com/2023/10/in-person-meeting-tomorrow-for-2127-dwight-way-in-downtown-berkeley.html
Plans have been published for the 23-story mixed-use high-rise at Tasman East in Santa Clara, one of Rockridge Geotechnical’s sites. The exact address of this tower will be 5185 Lafayette Street. The complex will create 198 apartments along with 3,000 square feet of retail space. Amenities include on-site parking for 310 cars, a fitness center, a pool, fire pits, cabanas, grills, and an outdoor entertainment space.
From SFYIMBY: https://sfyimby.com/2023/10/meeting-tomorrow-for-23-story-tasman-east-parcel-11.html
Plans to develop an eight-story residential complex at Rockridge Geotechnical’s 1150 Kifer Road site in Sunnyvale have been recommended for approval. This development would add 225 apartments to a growing transit-oriented hub in Sunnyvale and Santa Clara around the Lawrence Caltrain Station. Moreover, out of the 225 units, 44 will be affordable for low-income and very low-income households. The complex will also include amenity decks, as well as abundant landscaped space.
From SFYIMBY: https://sfyimby.com/2023/10/planning-department-approves-1150-kifer-road-in-sunnyvale.html
New leasing activity is occurring at a manufacturing building at 550 East Brokaw Road in San Jose, one of Rockridge Geotechnical’s sites. San Jose-based Supermicro Computer signed a lease for over 124,000 square feet at the site, the second-largest new lease signed in the third quarter of this year. Currently, the site is undergoing a massive redevelopment, creating seven eight-story office buildings and two parking structures to accommodate over 5,300 cars. Moreover, landscaped terraces will cover nearly 85,000 square feet of space.
From SFYIMBY: https://sfyimby.com/2023/10/supermicro-computer-leases-space-at-550-east-brokaw-road-san-jose.html
Plans have been approved for an eight-story apartment complex at Rockridge Geotechnical’s 1598 University Avenue site in Berkeley. This development will create 207 new units, 21 of which will be affordable, along with nearly 6,000 square feet of commercial retail space. 1598 University aims to be transit-oriented, as it is within walking distance of both the North Berkeley and Downtown Berkeley BART stations.
From SFYIMBY: https://sfyimby.com/2023/09/berkeley-city-council-approves-1598-university-avenue-by-nx-ventures.html
More details have come out regarding the $7 million dedicated by the University of California Board of Regents to the student housing development at 2200 Bancroft Way in Berkeley, one of Rockridge Geotechnical’s sites. The $7 million will be used for architecture design fees, campus administration, pre-design studies and environmental planning items, and surveys, tests, and plans. Construction will require additional financing. Moreover, we have learned that the building will be between 10 and 15 stories in height, and it will include amenities such as a dining facility, fitness space, study rooms, and lounges.
From SFYIMBY: https://sfyimby.com/2023/09/predevelopment-funding-for-student-housing-at-2200-bancroft-way-southside-berkeley.html
The University of California Board of Regents approved over $7 million in funding for the predevelopment phase of the proposed student housing building at Rockridge Geotechnical’s site at 2200 Bancroft Way in Berkeley. This development aims to create 1,400 new beds for students, with most rooms in the complex being shared by three students. Moreover, this complex is part of UC Berkeley’s long-term strategy to address its student housing shortage, which is one of the worst in the country.
From The Business Journals: https://www.bizjournals.com/sanfrancisco/news/2023/09/22/uc-berkeley-2200-bancroft-student-housing.html
A ribbon-cutting ceremony was held for the opening of a supportive housing complex at 2118 Sacramento Street in Vallejo, one of Rockridge Geotechnical’s sites. This complex, which includes the construction of modular homes, will create 75 units of 100% permanent supportive housing for individuals and households that are either at-risk or currently experiencing homelessness. On-site amenities include a computer learning center, a community room with a kitchen, on-site laundry facilities, and a landscaped outdoor courtyard with a play area.
From SFYIMBY: https://sfyimby.com/2023/09/inauguration-unveils-blue-oak-landing-supportive-housing-in-vallejo.html
Plans were approved for a six-story, 242-unit apartment complex at Rockridge Geotechnical’s site at 11 El Camino Real in San Carlos, replacing a surface parking lot and CVS Pharmacy that are currently on-site. The development will allocate over 12,000 square feet to amenities, which include pool decks, seating, an amenity room, and on-site parking for cars and bicycles.
From SFYIMBY: https://sfyimby.com/2023/09/plans-approved-for-housing-at-11-el-camino-real-san-carlos.html
Past Posts
By Month
- October 2026
- September 2026
- August 2026
- July 2026
- June 2026
- May 2026
- April 2026
- March 2026
- February 2026
- January 2026
- December 2025
- November 2025
- October 2025
- September 2025
- August 2025
- July 2025
- June 2025
- May 2025
- April 2025
- March 2025
- February 2025
- January 2025
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- July 2024
- June 2024
- May 2024
- April 2024
- March 2024
- February 2024
- January 2024
- December 2023
- November 2023
- October 2023
- September 2023
- August 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
