Building permits have been submitted for a four-story residential complex at 950 Hough Avenue in Lafayette, a Rockridge Geotechnical site adjacent to the Lafayette BART station. The development will create 20 two- and three-bedroom condominiums, with three of those condos being affordable, and on-site parking for 45 cars.
From SFYIMBY: https://sfyimby.com/2023/01/permits-filed-for-950-hough-avenue-lafayette-contra-costa-county.html
Ground has been broken for the American Buddhist Cultural Society, a six-story structure that will provide new facilities for the San Bao Temple. Sitting at Rockridge Geotechnical’s 1750 Van Ness Avenue site, this new development will create classrooms, a bamboo courtyard, a tea house, and a new main shrine hall for the San Bao Temple, in addition to other amenities.
From SFYIMBY: https://sfyimby.com/2023/01/groundbreaking-for-american-buddhist-cultural-society-in-san-francisco.html
A revised plan has been submitted to upgrade a proposed residential complex in Oakland from 92 units to 166 units. The complex, which sits at Rockridge Geotechnical’s 820 West MacArthur Boulevard site, is moving from a mix of studio and two-bedroom units to just studio units. The development will also provide a ~2,700-square-foot open-air plaza.
From SFYIMBY: https://sfyimby.com/2023/01/plans-revised-for-apartments-at-820-west-macarthur-boulevard-longfellow-oakland.html
Building permits have been filed for a nine-story residential development at Rockridge Geotechnical’s site at 1462 Pine Street in San Francisco. The structure will have 104 units of housing, 23 of which will be affordable, along with amenities such as on-site parking, offices, a community room, and a central courtyard.
From SFYIMBY: https://sfyimby.com/2023/01/new-building-permits-filed-for-1462-pine-street-nob-hill-san-francisco.html
The San Jose Planning Commission is reviewing the redevelopment proposal at Rockridge Geotechnical’s 550 East Brokaw Road site in San Jose. The redevelopment would create a seven-building, 1.9 million-square-foot office development with parking for 5,385 cars and 410 bicycles. It would also create a public park next to the office buildings.
From SFYIMBY: https://sfyimby.com/2023/01/meeting-for-former-frys-electronics-redevelopment-in-north-san-jose.html
Developer Greystar is requesting an extension for Parcels 20 and 27 within the Tasman East development in Santa Clara, one of Rockridge Geotechnical’s sites. Parcels 20 and 27 will provide 371 units of housing and a 306-car garage, while the entire Tasman East Specific Plan calls for 4,500 units of housing, retail space, office space, a public park, a food hall, and other mixed-use aspects.
From SFYIMBY: https://sfyimby.com/2023/01/greystar-requests-extension-on-approval-for-tasman-east-parcels-20-and-27-santa-clara.html
An eight-story, 225-unit residential complex has been proposed at Rockridge Geotechnical’s site at 1150-1170 Kifer Road in Sunnyvale. The development, which will include 36 low-income units and eight very low-income units, shares a parcel with two existing office buildings. The complex will also have three levels of on-site parking.
From SFYIMBY: https://sfyimby.com/2023/01/apartment-complex-proposed-at-1150-1170-kifer-road-in-sunnyvale.html
Building permits have been filed for the six-story, 75-unit mixed-use development at Rockridge Geotechnical’s 2700 International Boulevard site in Oakland. Along with 75 apartments, the structure will have over 4,500 square feet of retail space and 1,600 square feet of office space. Moreover, 74 of the 75 units will be affordable.
From SFYIMBY: https://sfyimby.com/2023/01/permits-approved-for-2700-international-boulevard-fruitvale-oakland.html
Pre-application plans have been filed for a six-story, 65-unit development at Rockridge Geotechnical’s site at 2201 San Pablo Avenue in Berkeley. Six of the units will be for very low-income residents, utilizing the State Density Bonus program to allow for a 50% increase in project density. The complex will also include retail space and a childcare facility.
From SFYIMBY: https://sfyimby.com/2023/01/pre-application-filed-for-2201-san-pablo-avenue-southwest-berkeley.html
We are proud to announce that Rockridge Geotechnical is a part of six of the 13 largest construction projects (by cost) currently underway in Oakland, including the office and retail complex 300 Lakeside, which is the largest development. The other five developments are 1900 Broadway, UCSF Benioff Children’s Hospital, Ancora Place, 1510 Webster, and Castlemont High School.
Link to Book of Lists, which contains Oakland construction list: https://www.bizjournals.com/sanfrancisco/digital-edition?issue_id=20672
Past Posts
By Month
- January 2025
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- July 2024
- June 2024
- May 2024
- April 2024
- March 2024
- February 2024
- January 2024
- December 2023
- November 2023
- October 2023
- September 2023
- August 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022