A discussion is being held to review the revised plans for a five-story, 144-unit development at Rockridge Geotechnical’s 3030 Telegraph Avenue site in Berkeley. Along with the residential portion, the building will include a 1,550-square-foot corner retail space, and seven of the apartments will be designated as affordable for very low-income households. Other amenities will include an outdoor fitness zone, a café, and a barbecue cooking bar.
From SFYIMBY: https://sfyimby.com/2023/05/meeting-tonight-for-3030-telegraph-avenue-south-berkeley.html
An application has been submitted to create an affordable housing complex at 8452 Edes Avenue in Oakland, one of Rockridge Geotechnical’s sites. The development would convert the Comfort Inn & Suites currently on-site into a permanent affordable housing complex. The conversion would turn hotel rooms into apartments while also adding a communal kitchen. Currently, the number of proposed residential units is unknown.
From SFYIMBY: https://sfyimby.com/2023/05/preliminary-application-filed-for-affordable-housing-at-8452-edes-avenue-oakland.html
Restoration plans have been proposed for the Sierra Madre Apartment complex at Rockridge Geotechnical’s site at 421 Leavenworth Street in San Francisco. The six-story building was damaged by fire in 2021, and this project would rehabilitate the 47 units of public housing within the complex, as well as the community room.
From SFYIMBY: https://sfyimby.com/2023/05/restoration-planned-at-421-leavenworth-street-in-tenderloin-san-francisco.html
New renderings have been released for the residential development at 3000 Shattuck Avenue in Berkeley, one of Rockridge Geotechnical’s sites. Out of the proposed 166 residential units, 17 of the project’s units will be affordable so the developer can use the State Density Bonus program. Amenities will include bicycle parking and a courtyard with a garden for residents, as well as ~1,000 square feet of retail space.
From SFYIMBY: https://sfyimby.com/2023/05/new-renderings-for-3000-shattuck-avenue-in-south-berkeley-alameda-county.html
An Environmental Impact Report is being prepared for a mixed-use development at Rockridge Geotechnical’s site at 749 West El Camino Real in Mountain View. The proposed six-story structure would include 299 residential units, 33 of which would be affordable. The complex would also contain 10,740 square feet of retail space along with on-site parking. A subsidiary structure to house the Chase Bank branch currently on-site is also included in the proposal.
From SFYIMBY: https://sfyimby.com/2023/05/draft-eir-preparation-starts-for-749-west-el-camino-real-mountain-view.html
Plans have been submitted to reduce the number of units and stories at a residential development at Rockridge Geotechnical’s 3801 Telegraph Avenue site in Oakland. The complex was initially going to be six stories with 158 units, but it will now be five stories with 110 units. However, the 2,350 square feet of commercial retail space will remain the same, with a café on the ground floor.
From SFYIMBY: https://sfyimby.com/2023/05/reduced-plans-filed-for-3801-telegraph-avenue-in-mosswood-oakland.html
A mixed-use residential building is for sale at 1174-1178 Folsom Street in San Francisco, one of Rockridge Geotechnical’s sites. The complex, named OME, contains 42 residential units, ~5,700 square feet of commercial office space, three ground floor retail spaces, and ~2,200 square feet of lower-level office/storage space.
From SFYIMBY: https://sfyimby.com/2023/05/multi-family-complex-on-sale-at-1174-1178-folsom-street-soma-san-francisco.html
Construction has topped out for Kiku Crossing, a residential development at Rockridge Geotechnical’s site at 400 East 5th Avenue in San Mateo. The complex will create 225 units of housing, all of which will be affordable, with the homes ranging from studios to three-bedroom apartments. The development will also include a 696-space parking garage, as well as other residential amenities like a learning center, community room, and open-air courtyard with recreational space.
From SFYIMBY: https://sfyimby.com/2023/05/construction-tops-out-for-kiku-crossing-affordable-housing-in-san-mateo.html
Renderings have been released for the six-story residential development at Rockridge Geotechnical’s 2127 Dwight Way site in Berkeley. The project will create 58 units of housing while also retaining eight additional units in two existing buildings. In total, eight homes will be designated as affordable units, with developer Riaz Capital utilizing the State Density Bonus program and Senate Bill 330.
From SFYIMBY: https://sfyimby.com/2023/05/new-renderings-for-2127-dwight-way-for-downtown-berkeley.html
Construction is nearly finished for the first phase of development of a senior living complex at 3575 Mendocino Avenue in Santa Rosa, one of Rockridge Geotechnical’s sites. The first phase will deliver 94 of the 162 homes that will be created for low-income seniors in an apartment complex called The Laurel. An additional 260 market-rate homes will also be added to the site, totaling around 420 apartments.
From SFYIMBY: https://sfyimby.com/2023/05/phase-1-construction-continues-for-senior-housing-at-3575-mendocino-avenue-santa-rosa.html
Past Posts
By Month
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- July 2024
- June 2024
- May 2024
- April 2024
- March 2024
- February 2024
- January 2024
- December 2023
- November 2023
- October 2023
- September 2023
- August 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022